Before work is carried out on an electrical installation, it must be de-energised and remain so for the duration of the work. The implementation instructions for § 6 of DGUV Vorschrift 3 and DIN VDE 0105-100 describe five safety rules for this. Applying them must be standard practice.
- Disconnect
- Secure against reconnection
- Verify absence of voltage
- Earth and short-circuit
- Cover or fence off adjacent live parts
This sequence applies in general. With remote-controlled or interlocked installations, the design may result in a different one. You always start by disconnecting.
Disconnect
Disconnecting means switching off all non-earthed conductors on all sides. In everyday work, this often fails on details. A light switch usually only breaks one conductor. With two-way switching, both supply lines to the luminaire can even be live when the light is switched off. Anyone working on lighting therefore switches off the circuit breaker or removes the fuse.
If someone else has disconnected, you wait for their confirmation. Verbal and telephone messages are repeated and confirmed back, with names. The fact that there is no voltage at the moment does not prove that the installation has been disconnected.
Secure
A padlock on the main switch or a lockout device on the circuit breaker prevents accidental reconnection. A prohibition sign indicating the work belongs with it. Removed fuse links are best put in your pocket and taken to the work location. Even safer are locking elements that can only be removed with a special key.
Verify
The absence of voltage is verified at the work location, on all poles at each individual conductor. Only a qualified electrician (Elektrofachkraft) or an electrically instructed person may do this. For low voltage, the DGUV recommends two-pole voltage testers. Before use, the user checks whether the device is approved for the voltage range and works properly. If it does indicate voltage after all, you start again with the first rule.
Earth, short-circuit, cover
The earthing and short-circuiting device is first connected to the earthing system and only then to the part of the installation. It should be visible from the work location. In installations up to 1000 volts, the rules allow this step to be omitted under certain conditions once the installation has been disconnected, secured and verified as dead. On overhead lines, this relaxation only applies to lines with protective insulation. In installations above 1 kV, earthing and short-circuiting are part of the procedure.
If adjacent parts remain live, they are covered or fenced off. The danger zone is marked clearly, for example with barrier ropes or with warning crosses in front of adjacent switch panels.
When the work is finished, the measures are removed in reverse order, but only once all persons have left the work location and tools and materials have been removed.
Sources
- DGUV Vorschrift 3: Electrical Installations and Equipment
- DGUV Information 203-002: Qualified Electricians
- DGUV Information 203-001: Safety when working on electrical installations
This article provides an overview and does not replace legal advice. The linked legal sources in their currently applicable version are authoritative.
Related training: Responsible Qualified Electrician (VEFK) and Switching Authorisation